Home Projects Fire Protection & AMC Birla Century Mega Textile Plant
Fire Protection & AMC

Birla Century Mega Textile Plant

Bharuch, Gujarat

Complete Turnkey Fire Protection System, Hydrant Ring Main Network, Automatic Sprinklers & 24/7 Comprehensive AMC Support.

Client
Birla Century (Aditya Birla Group)
Project Type
Industrial Mega Plant
Building Height
100+ Acre Campus
Project Value
₹ 4.5+ Crore
Duration
Annual AMC & Turnkey System
Year of Completion
2024–Present
Project Overview
FPS Enterprises engineered, installed, and maintains the comprehensive fire protection and safety infrastructure for Birla Century's 100+ acre state-of-the-art textile manufacturing facility in Jhagadia, Bharuch. Operating continuously around the clock with high-density spinning, automated weaving, and chemical finishing units, the complex demands fail-safe fire readiness, continuous line pressure, and full compliance with NBC 2016 Part 4 and TAC standards.
“

“FPS Enterprises has been an exemplary fire safety and AMC partner for Birla Century. Their proactive maintenance, rapid emergency turnaround, and technical expertise ensure our 100-acre facility remains fully protected and 100% compliant with statutory audits.”

Chief Safety & Infrastructure Officer
Birla Century, Aditya Birla Group

The Challenge

  • 100+ Acre Sprawling Facility: Maintaining steady 10.5 bar pressure across extensive underground and overhead ring mains serving multiple dispersed production plants.
  • High-Hazard Combustible Textile Environment: Raw cotton fiber, spinning dust, and finishing chemicals required instant automatic suppression and zero flame propagation.
  • Zero Production Interruptions: All preventive servicing, pipe renewals, and 500+ extinguisher hydro-tests had to be executed without disrupting 24/7 industrial manufacturing shifts.

Our Solution

  • High-Capacity Dual Diesel & Electric Pump House: Engineered multi-stage centrifugal fire pump skids delivering 2850 LPM with automatic jockey pressure replenishment.
  • Comprehensive Multi-Zone Hydrant & Sprinkler Ring: Deployed heavy-duty landing valves, swinging hose reel drums, and high-temperature rapid-response sprinklers.
  • Dedicated On-Site AMC & Emergency Protocol: Regular bi-weekly pressure audits, certified hydro-testing of all extinguishers, and scheduled mock drill training.

Key Results

  • 100% Statutory Compliance: Zero non-compliance findings in State Fire Safety audits and TAC insurance inspections.
  • Zero Unplanned Downtime: Over 36 months of continuous fail-safe fire readiness recorded across all manufacturing sectors.
  • Sub-90-Second Emergency Response: Strategic placement of equipment reduced first-responder intervention time to under 90 seconds.
Technical Specifications
System Type
Turnkey Fire Hydrant, Sprinklers & AMC
Industry Sector
Industrial Textile Manufacturing
Plant Location
Jhagadia, Bharuch, Gujarat
Compliance Standards
IS 15683, IS 3844, NBC 2016 Part 4, TAC
Pump Capacity
2850 LPM @ 10.5 Bar Dual Skid
Scope of Work
Ring Main, 500+ Extinguishers, 24/7 AMC
Project Location

Have a Similar Project in Mind?

Get in touch with our experts for a customized solution tailored to your requirements.

Expert Consultation
Customized Solutions
On-Time Delivery
Home Call WhatsApp Enquire